Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13668813

- Product Categories
- Friendly Links
Information Name: | Ten brand home improvement waterproof coating waterproof paint manufacturers |
Published: | 2015-05-16 |
Validity: | 30 |
Specifications: | 20 kg |
Quantity: | 99999.00 |
Price Description: | |
Detailed Product Description: | Decoration waterproof paint manufacturers of home improvement waterproof paint manufacturers JS polymer cement-based waterproof coating I. Introduction Hopkins Shield waterproof polymer coating is made of imported high emulsion after modified by various additives with cement and other inorganic powder configuration a waterproof material. This product has been mixed with a certain proportion of cement into a sticky coating, painted after 3-4 times become cured rubber-like elastic waterproof layer. Cured waterproof membrane formation, extensibility, good strength, excellent water resistance, adhesion, anti-aging agent impermeability. The product is non-toxic, non-polluting, easy construction, can be used in wet grass. Second, the product features have a certain flexibility; good adhesive properties, may be applied to the wet surface of the base; easy to be tiled in the outer waterproof layer, brushing paint; weather resistance, high temperature resistant; with less, low cost; non-toxic, harmless, non-polluting, easy construction. Third, the scope is widely used in roofing, bathroom, outside the walls, pools, dams, basements, tunnels, air defense projects waterproof, anti-leakage, moisture and other projects. Fourth, the technical indicators of the implementation JC / T 864-2000 standard indicators Fifth, use waterproof coating 1. Press: cement = 1: 1.5 weight ratio mix evenly, when foot thick waterproof glue, allows you to add the right amount of water will dilute, parametric less than 2%. 32.5R cement requirements than Portland cement. 2. Each square meter dosage: about 1.0kg. According to the construction part of the specific circumstances and the base surface. Sixth, the construction requirements 1. Base surface treatment: the base surface must be flat, solid, no leakage, uneven and cracks first Calibrating plugging leaks should be treated. 2. When each layer construction coated brush or scraper, coating as even as possible, subject to several brush so as not to leave air bubbles, paste tight and strong. 3. The time interval between the layers of the previous layer is completely dry non-stick prevail (usually 2-4 hours) depending on environmental temperature varies. Liquid and powder material 4. Stir the two components must not precipitate, the precipitate should be found in time, stir to not affect the quality. 5. base out of water and rain, not construction, should be used with the distribution with the use of paint should be mixed within 2 hours after use. Seven, storage and transportation Package: net weight 20kg Specifications and 10kg. Store in a cool, dry place, away from direct sunlight. |
Admin>>>
You are the 8146 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou Baiyun District fertile Hopkins Shield waterproof building materials factory All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 8146 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou Baiyun District fertile Hopkins Shield waterproof building materials factory All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility